Before deciding to dig your own well, you must understand what is involved. For example, do you know how long it will take to dig a well? Continue reading this article to get the answer to that question and more pertinent information.
Having a private well at home confers total control over one’s water supply. There are no use limitations or abrupt shutoffs to worry about. A private well may also be an asset that increases the value of a house.
How long does it take to drill a well?
How long will it take a competent firm to drill your private well to completion? There are two possible responses to this question.
In terms of the actual drilling of the water well, the procedure is quite brief. The drilling process may take four to six hours.
Now, if you want to know how long it will take to build the private well from pre-installation to the point where you have access to pure water, it will take some time. The complete project’s timeframe may stretch two weeks.
Dissecting the Private Well Installation Method
To comprehend why private well installation takes as much time as it does, we must examine the processes involved.
The Phase Before Installation
If you wish to dig a private well on your land, you cannot begin drilling immediately. Prior to reaching this stage, you must finish the pre-installation process.
During the pre-installation phase, the optimal location for the private well is determined. The drilling firm you chose may advise you on the location of your private well.
After selecting a location, you will need to get permissions for your project. Your professional partners may also assist you in acquiring these permissions.
Usually, the duration of the pre-installation will depend on how soon permissions are issued. If everything goes well, the permits may be accessible within a few days. Unfortunately, it may take up to a week for the permissions to be issued.
How long is the Drilling Procedure
Next is the phase of drilling. The pros will use a power drill to make a 100-foot-deep hole in the earth during this phase.
Depending on the specifics of your property, this procedure may take around four hours to complete. Even if your property is in less-than-ideal condition, this portion of the procedure should take around six hours.
Phase of Installation
The installation phase entails laying cement to act as the foundation of your well and installing the required equipment. This phase of the project concludes after the well has been sealed.
Your private well installation will take between one and two days.
The Evaluation Phase
Having constructed the private well, you must now determine if the water it produces is potable. Testing water takes around two to three days. Avoid cutting corners on water testing, since doing so might endanger your health.
The time required to drill a private well is substantial, but it will be worthwhile in the end. By digging a private well, you may address a number of water supply-related problems. Contact us to learn more!